The World’s Gym in Peachtree City, GA. This job had some conflicts arise during field measurements. Somehow the structural engineer forgot about the thickness of the beams and the building was built too short to make the HVAC drawing duct sizes work. While working with the GC, the contractor, and on site engineers we were able to draw 3D CAD drawings and made the job work for the customer.